Here, I document the A&infrastructure based upon a 1912 Southern Railwchart. This page will cover the CR line from the junction at Climax to Ramseur. Separate pages will document the CF main line and Madison branches.

For explanations of the codes under Operating, Passenger and Freight columns, see Track Chart Codes

CR Line

Page
Item

Freight
Station

Passenger
Station

STATIONS

Altitude

Station
Number

Operating

Passenger
and Freight

COUNTY

Clearance
Length of Siding
in feet.

Foreign Connections

1 0.0 0.0 (Main Line Conn.) ……   ……………………      
  0.0 0.0 Section CR 1. …… Lineberry ……………………    
2 0.0 0.0 CLIMAX  % 827 CR 0  CF 82 u f t d w y v Guilford 769
  0.52 0.52 "County Line" …… ………………. …………………… "  
3 2.5 2.6 Red Cross CR 3 ………………. a h x D Randolph 77
4 3.6 3.7 Neeses Spur Track …… ………………. a h x " 210
5 4.5 4.6 Lineberry 827 CR 5 ………………. a h x D " 111
6 5.8 5.9 Pughs Siding …… ………………. a h x " 80
7 9.5 9.6 Millboro 759 CR 10 u f t d w y v " 705
  10.0 10.1 Section CR 2. …… Cedar Falls …………………… "  
8 12.7 12.8 Hix Creek Trestle …… 20 ft. …………………… "  
9 13.3 13.3 Trestle …… 116 ft. …………………… "  
10 13.5 13.5 Pone Creek Trestle …… 258 ft. …………………… "  
11 13.6 13.6 Cedar Falls Factory Spur …… ……………….. a h x " 40
12 13.8 13.8 Cedar Falls Tank  (Gravity) …… E …………………… "  
13 14.1 14.2 Cedar Falls 509 CR 14 u f t d w y v " 309
14 15.4 15.4 Bush Creek Trestle …… 154 ft. …………………… "  
15 15.7 15.7 Walnut Creek Trestle …… 93 ft. …………………… "  
16 16.2 16.2 Franklinville 469 CR 16 u f t d w y v " 793
17 16.7 16.7 Island Ford Siding CR 17 ………………. a h x " 140
18 17.2 17.3 Sandy Creek Trestle …… 193 ft. …………………… "  
19 18.3 18.3 Hollands Creek Trestle …… 216 ft. …………………… "  
20 18.74 18.74 Ramseur 440 CR 19 K u f t d w y v " 1391